Yurt Update

We had a productive two days at the Kitsap Yurt site this week. On Friday Craig McCoy and his tractor dug the 100' trench from the main electrical box to the yurt site and he also prepared the site for the shed we bought off of craiglist. Thanks, Craig!. Mac Smith, our contractor,  worked on the ramp to the yurt.

On Saturday we had three different projects going at the same time. Kalen Spees, Brian Lindvall, Jimmy Paulsen and Gary Spees split all of the wood at the yurt site (2 cords worth) and stacked the wood in the wood shed. This was an all-day project, using a nifty electric splitter that Jimmy borrowed for us. Thanks, guys!

Scott Eby laid all of the pvc pipe and electrical wire from Toutle (the flush toilet building) to the yurt, and did all of the electrical connections at either box (a 10 hour job). Thanks, Scott!

Then three wonderful guys delivered a shed to us and spent 4 hours putting it together on site and putting on a new roof. We now have ready-made storage for the yurt. Thanks to Cody, Toby & Tighe.

All-in-all, a productive week at the Kitsap Forest Theater. Check out the new pictures posted on the Photo site under "Yurt at Kitsap". 

  •  
0
  7893 Hits
7893 Hits