Home / Kitsap Property Projects and Workparties / Kitsap Cabin Restoration - 2001- 2004 / Cabin Restoration Foundation Work Jan 2002 28
More photos of the foundation work just before completion. Good photos of the structural improvements to bring Kitsap Cabin up to current building codes.
- dscn0495
A new floor joist was added to each existing joist to increase the strength of the floor to meet current building codes. - dscn0500
Another picture of where the old log beam was cut back (right) and a new beam is installed (left). - dscn0501
A great picture of where the old log beam was cut back (right) and a new beam is installed (left). - dscn0502
A new concrete pier waiting for it's post to be installed. - dscn0504
The large concrete pad for the chimney foundation. It's about 6 feet by 10 feet. That's a lot of concrete. - dscn0508
Some of the piers have two posts (bottom) to support the old logs and the new beams (top). - dscn0509
Sizing up the job before crawling under to work. - dscn0512
The height of the beam is adjusted with a hydraulic jack before the post is set. - dscn0513
"Measure twice cut once, or is it the other way around?" - dscn0521
The posts are cut to rough size with a chain saw before they are placed.